SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2012111094,"Truckee, City of",City of Truckee,,Truckee River Legacy Trail Phase 3B,MND,11/30/2012,,"Note: Reference SCH# 2009092044 The Town of Truckee is proposing to construct 2.11 miles of Class I (paved, multi-use) trail along the Truckee River. For most of its length, the trail will consist of a 10-foot wide asphalt concrete paved trail with 2-foot wide aggregate base shoulders on either side. The Truckee River Legacy Trail Phase 3B consists of a trail extension beginning at the easterly end of the recently completed Phase 3A segment and follows along the south bank of the Truckee River past the Tahoe-Truckee Sanitation Agency Wastewater Treatment Plant, spans Martis Creek, and then ascends to a connection to Glenshire Drive. The trail will cross Martis Creek upstream of its confluence with the Truckee River. This crossing will consist of a prefabricated steel bridge. A portion of the trail (approximately 240 feet) will be constructed within the 100-year floodplain of the Truckee River.",https://ceqanet.opr.ca.gov/2012111094,Truckee River Legacy Trail Phase 3B,Becky Bucar,City of Truckee,N/A,,10183 Truckee Airport Road,,Truckee,CA,96161,5305822932,,Truckee,Nevada,,,96161,,"49-330-04, 05 49-011-06, 25, 28, 29",Hwy 89,"Truckee River, Martis Creek, Martis Creek Reservoir",Truckee-Tahoe,Yes,11/30/2012,12/31/2012,Recreational,,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,