SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2012111088,Castaic Lake Water Agency,,,Upper Mesa Solar Power Generation Facility at the Castaic Lake Water Agency's RVWTP,NEG,11/28/2012,,"The Project would install a 3.5 MW Photovoltaic (PV) solar project on 19.5 acres of CLWA-owned land located within the current boundaries of the RVWTP. The Project would generate enough electricity annually to partially meet the electrical demands for 44 of 82 off-site meters owned by CWLA and its retail division, the Santa Clarita Water Division (3.5 MW). Because the peak generation of the solar plant is during summer daylight hours and is not identical to the demand curve of the off-site meters, the plant will operate under ""net metering"" characteristics and be part of the Renewable Energy Self-Generation Bill Credit Transfer program (RES-BCT). Net metering permits excess energy generated to be supplied to SCE's distribution network and used to offset energy costs at the off-site meters even if demand occurs outside of the period of solar power generation. This demand and supply balancing must occur within the same calendar year and excess generation cannot be carried over into the following year.",https://ceqanet.opr.ca.gov/2012111088,Upper Mesa Solar Power Generation Facility at the Castaic Lake Water Agency's RVWTP,Jeff Ford,Castaic Lake Water Agency,N/A,,27234 Bouquet Canyon Road,,Santa Clarita,CA,91350,6612971600,34°26'0"N 118°30'40"W,Santa Clarita,Los Angeles,,Bonquet Canyon Road/Centurion Way,91350,19.5,2849-002-900 & 2849-002-903,SR 126,"Santa Clara River, Bonquet Creek",,No,11/28/2012,12/27/2012,Other,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Geology/Soils, Hazards & Hazardous Materials, Land Use/Planning, Noise, Public Services, Vegetation, Wildfire",,,,,,,,,,,,,,,,,