SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2012102034,Central Valley Flood Protection Board,,,Folsom Dam Modification Project - Water Control Manual Update,SIR,6/7/2017,,"A draft SEA/EIR has been prepared for the Folsom Dam Modification Project - Water Control Manual Update. The purpose of the proposed action is to reduce flood risk and improve dam safety in the Sac Metro Area by implementing operational changes of the new auxiliary spillway. The new operations will meet goal associated with dam safety and flood damage reduction benefits including: 1) passing the Probably Max Flood with three ft of free board; 2) controlling a 1/100 annual chance event, 3) control a 1/200 annual change event; 4) reducing variable space storage from 400,000-670,000 acre ft to the National Weather Service. Environmental effects evaluated in detail include hydrology, water supply and deliveries, biological resources, recreation, hydropower, and cultural resources. Cultural resources impacts could be potentially significant and unavoidable.",https://ceqanet.opr.ca.gov/2012102034/2,Folsom Dam Modification Project - Water Control Manual Update,Vincent Heim,Central Valley Flood Protection Board,N/A,,3464 El Camino Avenue,,Sacramento,CA,95821,9165742310,,Folsom,"El Dorado, Placer, Sacramento",,Folsom-Auburn Blvd & Folsom Lake Crossing,95630,,,,Folsom Lake,,Yes,6/7/2017,7/21/2017,,,"Biological Resources, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hydrology/Water Quality, Public Services, Recreation, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,