SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2012101010,Tulare County,,,Harvest - Tulare Anaerobic Digester and Compressed Natural Gas Facility Project,NOP,10/3/2012,,"The Harvest-Tulare composting facility currently holds operating permits to compost green material, food, and dairy manure. The proposed project will increase and shift types of materials and quantities accepted at the facility. Harvest Power California LLC is proposing to add an anaerobic digester to the existing Harvest-Tulare composting operations to process organic materials into fuel and digestate that will contribute to soil amendment production. Both a high solids digester (processing food and green material) and a low solids digester (processing primarily food material) alternatives will be evaluated in the environmental document. The proposed project will increase total tonnage at the site from 86,000 tons per year to a potential 216,000 tons per year. The increase includes both the proposed anaerobic digester and increasing tonnages at the composting facility. The facility will produce transportation fuel either through a compressed natural gas (CNG) refueling station or by injecting directly into a nearby natural gas pipeline. Therefore, both a CNG refueling station and direct injection to the natural gas pipeline will be evaluated. ",https://ceqanet.opr.ca.gov/2012101010,Harvest - Tulare Anaerobic Digester and Compressed Natural Gas Facility Project,Hector Guerra,Tulare County Resource Management Agency,N/A,,5961 South Mooney Boulevard,,Visalia,CA,93277-9394,5596247121,36°13'56.58"N 119°16'10.54"W,Tulare,Tulare,,Road 140 and Avenue 240,93274,40,"150-130-014, 150-130-016",SR 137 & 63,,,Yes,10/3/2012,11/1/2012,"Industrial, Waste Treatment",Use Permit,"Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Hydrology/Water Quality, Land Use/Planning, Noise, Transportation",,,,,,,,,,,,,,,,,