SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2012092037,Golden Gate Bridge Highway and Transportation District,,,Sausalito Ferry Terminal Vessel Boarding Rehabilitation Project,NOD,7/24/2017,7/24/2017,"The Golden Gate Bridge, Highway and Transportation District proposes to replace the existing passenger boarding system with a new boarding system. The replacement passenger boarding system will be located in approx. the same location as the existing and will include a new 145.5 feet long x 53 feet wide concrete float, a new 90 feet long x 16 feet wide steel gangway and a new 21 feet wide pile-supported concrete pier with 5 feet wide x 36 feet long bump-outs. The Modified Project also includes the construction of temporary facilities to maintain current ferry service during the demolition of the existing boarding system and the construction of the new boarding system. The temporary facilities will be located immediately adjacent to and south of the existing boarding system. The gangway and float of the existing boarding system will be used for the temporary facilities, with access provided by a temporary 8 feet wide access pier.",https://ceqanet.opr.ca.gov/2012092037/3,Sausalito Ferry Terminal Vessel Boarding Rehabilitation Project,John R. Eberle,Golden Gate Bridge Highway and Transporation District,N/A,,Presidio Station,P.O. Box 9000,San Francisco,CA,94129-0601,4159232003,37°51'22"N 122°28'39"W,Sausalito,Marin,,Bridgeway Avenue and Anchor Street,94965,0.313,065-073-05,Hwy 101,San Francisco Bay,N/A,,,,,,,,,,,,"Golden Gate Bridge, Highway & Transportation District ",Yes,4/8/2013,No,No,Yes,,No,,No,Yes,"Golden Gate Bridge Toll Plaza, SF, CA"