SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2012062077,"Galt, City of",City of Galt,,Fairway Oaks Subdivision Project,NOD,10/3/2012,10/3/2012,"The Fairway Oaks Subdivision Project would consist of 100 single-family lots, ranging from 8,000 square feet to 18,291 square feet. A 10.7-acre Open Space area would also be located on the project site, which includes a neighborhood park with an oak tree preserve and a Class I bike trail that travels along Dry Creek. In addition to the Open Space features on the project site, a variety of environmental features including water, energy, and solid waste conservation measures shall be included in the proposed project design. A 30-foot-wide pedestrian and bicycle connection is proposed from Chase Drive to Glendale Avenue, between lots 98 and 99. The proposed project would incorporate fully paved roads conforming to 50-foot and 60-foot right-of-way sections. An alternative access route to the project site shall be implemented as part of the proposed design features. The alternative access would be a direct connection from the project site to the Glendale Avenue/SR 99 southbound ramps intersection, which would be located at the proposed 30-foot-wide pedestrian and bicycle connection site. Project entitlements include approval of a Rezone from R1A-PD to R1C-PD and approval of the Vesting Tentative Map.",https://ceqanet.opr.ca.gov/2012062077/2,Fairway Oaks Subdivision Project,Chris Erias,City of Galt Planning Department,N/A,,495 Industrial Drive,,Galt,CA,95632,2093667230,38°14'43.66"N 121°17'29.07"W,Galt,Sacramento,,South of Glendale Avenue/West of SR 99,95632,42.6,"150-0101-19, 150-0101-21, 150-0101-59",SR 99,Dry Creek,,,,,,,,,,,,,City of Galt ,Yes,10/2/2012,No,No,Yes,,Yes,,No,Yes,"City Clerks Office, 380 Civic Drive, Galt, CA 95632"