SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2012022002,"Los Altos Hills, City of",City of Los Altos Hills,,Barron Creek Channel Flood Control and Realignment Project,MND,2/1/2012,,"The proposed project consists of flood control measures to allow for continuous, unobstructed flow of water within Barron creek. The realignment, maintenance and revegetation of this 600 foot length of Barron Creek is located in the Town of Los Altos Hills. The existing creek channel has historically been modified from its original location and has been constructed with man-made materials.",https://ceqanet.opr.ca.gov/2012022002,Barron Creek Channel Flood Control and Realignment Project,Debbie Pedro,City of Los Altos Hills,N/A,,26379 Fremont Road,,Los Altos Hills,CA,94022,6509417222,37°22'54"N 122°08'9"W,Los Altos Hills,Santa Clara,,West Fremont Road and La Paloma Road,94022,5.57,"175-35-036, 002, 014, 028",I-280,Barron Creek,,Yes,2/1/2012,3/1/2012,Other,Site Plan,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Flood Plain/Flooding, Geology/Soils, Noise, Vegetation, Wetland/Riparian",,,,,,,,,,,,,,,,,