SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2011121092,Kern County,,,Construction of Bowman Road - Realignment to US 395 to 1.3 Miles East,NEG,5/17/2012,,"The County of Kern in cooperation with the U.S. Bureau of Land Management (BLM) proposes to construct a 24-foot-wide asphalt concrete roadbed with 6-foot-wide paved shoulders and 2 feet of shoulder-backing along a 1.3 mile road segment. Improvements will include installation of box culverts at four channel locations and demolition of the original asphalt road upon completion of the new road. The project will be within approx. 200-feet of right-of-way with portions under the jurisdiction of BLM, Caltrans & the County. The centerline of the roadway is not located on the section line per county standards; therefore, it is the intent of this project to construct a new road approx. 100 feet north of its current location in order to provide congruence and continuity to existing paved sections of Bowman Road. Any existing utilities that would conflict with the project design will be relocated. This project will help provide an adequate east-west circulation to alleviate congestion on SR 178 and improve air quality in the Indian Wells Valley Air Basin and Mojave Desert sub region.",https://ceqanet.opr.ca.gov/2011121092/2,Construction of Bowman Road - Realignment to US 395 to 1.3 Miles East,Yolanda Alcantar,Kern County Roads Department,N/A,,"2700 M Street, Suite 400",,Bakersfield,CA,93301,6618625292,35°36'29"N 117°42'41"W,Ridgecrest,Kern,,Jacks Ranch Road and Downs Street,93555,15.3,,Hwy 395,,,Yes,5/17/2012,6/15/2012,Transportation,,"Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Vegetation",,,,,,,,,,,,,,,,,