SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2011121051,"Escondido, City of",City of Escondido,,Cemetery Area Water Pipeline Replacement Project,FIN,10/15/2012,,"The proposed project consists of the abandonment of approximately 17,500 linear feet of existing 12- to 24 inch-diameter concrete-lined steel potable water pipeline within the City of Escondido and unincorporated County of San Diego. The pipelines would be replaced with approximately 12,600 lf of new pipe generally ranging between 12 and 24 inches in diameter and comprising steel, ductile iron, polyvinylchloride (PVC), or high-density polyethylene (HDPE) pipe material, as well as PVC or copper service laterals off the main lines. An approximately 5-foot-long section of 30-inch-diameter pipe would provide a connection point near the Oak Hill Memorial Park (Cemetery) entrance. New meters also would be constructed and, in some cases, existing meters would be relocated. The project would include construction of an approximately 2,545-foot-long, 20 inch-diameter HDPE recycled water pipeline which would not be activated until some point in the future. The project also would include construction of an approximately 10-by-20-foot pressure-reducing structure. The project would replace aging potable water transmission and distribution infrastructure, increase water delivery capacity and pressure to the project area, and maintain a reliable water supply and distribution system. The primary objective of the increase in pressure or capacity that could result from the proposed project is to improve the flow of water to existing property owners during a wildfire-related emergency. The existing pipelines would stay in service throughout the duration of construction, and would be capped and abandoned in place following implementation of the proposed replacement pipelines, or removed if necessary to provide room for the replacement lines.",https://ceqanet.opr.ca.gov/2011121051/2,Cemetery Area Water Pipeline Replacement Project,Bill Martin,City of Escondido,N/A,,"Planning Division, 201 North Broadway",,Escondido,CA,92025-2798,7608394557,33°12'"N 117°2'35"W,Escondido,San Diego,,"Reed Road, Cloverdale Road, Mountain View Drive, Whispering Highlands Drive",92027,29.7,240-180-03,Hwy 78,,,No,,,Other,,"Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,