SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2011091062,Coachella Valley Water District,,CVWD,Water Reclamation Plant No. 4 Headworks Project,MND,9/21/2011,,"The Coachella Valley Water District is proposing to construct a new headworks facility at WRP 4 in Thermal, CA. To improve the treatment process, CVWD has decided to decommission the existing preliminary treatment system and build a new headworks that would include screening, pumping, and grit removal and handling. The headworks facility at WRP 4 would use screens to remove large objects. The screened effluent would be pumped to the above-grade grit chamber, which would remove heavy inorganic materials, such as sand and gravel. Under the proposed project, influent pipelines would connect the proposed headworks to the existing Avenue 62 trunk sewer and to three 18-inch force mains. Following preliminary treatment at the headworks, effluent would be conveyed to existing biological treatment facilities via four proposed pipelines. The project would include a stub-out at the influent forebay for future connection to a septage.",https://ceqanet.opr.ca.gov/2011091062,Water Reclamation Plant No. 4 Headworks Project,Luke Stowe,Coachella Valley Water District,N/A,,85-995 Avenue 52,,Coachella,CA,92236,7603982651,,,Riverside,,Fillmore Street/Avenue 62,92274,~.5,VAR,"Hwy 86, 86S, 111, 195",Coachella Valley Stormwater Channel,Thermal,Yes,9/21/2011,10/20/2011,Waste Treatment,,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Sewer Capacity, Transportation, Vegetation, Wildlife",,,,,,,,,,,,,,,,,