SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2011091045,"San Diego, City of",City of San Diego,,Citywide Pipeline Projects 2011,ADM,4/12/2018,,"Note: FYI Installation of ~ 19,113 linear feet (LF) (3.62 miles) of a new, 36-inch diameter cement mortar lined & tape coated (CML&TC) steel pipeline and replacement of `16,051 LF (3.04 miles) of existing 16-inch diameter Polyvinyl Chloride (PVC). The project also includes some or all of the following improvements: installation of curb ramps, fire hydrants, valves, water meters, water boxes, water services, and slurry and street resurfacing. The Morena Pipeline project is part of the City of San Diego's on-going Sewer Main and Water Main Replacement Program (Citywide Pipelines Project MND No. 255100). This addendum is to be posted for 15 days.",https://ceqanet.opr.ca.gov/2011091045/7,Alvarado 2nd Pipeline Extension,Mark Brunette,City of San Diego,N/A,,"1222 First Avenue, MS 501",,San Diego,CA,92101,6194465379,,San Diego,San Diego,,Morena Blvd between Balboa Ave and Friars Rd.,92117,,,I-5,Tecolote Creek/Mission Bay,,No,,,Other,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Mineral Resources, Noise, Population/Housing, Public Services, Septic System, Sewer Capacity, Transportation, Vegetation, Wildfire",,,,,,,,,,,,,,,,,