SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2011091045,"San Diego, City of",City of San Diego,,Water and Sewer Group Job 1052A,NOD,6/30/2021,6/30/2021,"The proposed scope of work would Include water and sewer pipe replacement, new installation and abandonment. Approximately 9,473 LF of the existing 4-, 6-, 8-, 12-, and 16-inch diameter Asbestos Clay (AC) distribution water mains will be replaced with -Polyvinyl Chloride (PVC) pipes. Approximately 1,878 LF of AC water mains will be abandoned, and approximately 493 LF of new water pipes, Including associated water services, will be · installed. Approximately 2,315 LF of existing 6- and 8-inch diameter Vitrified Clay (VC) Concrete and PVC pipes sewer pipes will be replaced with PVC pipes. New installation will also include 1,041 LF of 8-inch PVC sewer mains, Approximately 1,008 LF of existing 6- and 8-inch PVC and VC sewer pipes will be abandoned, including associated sewer laterals, manholes, cleanouts, top hats and other associated work. The project Includes the replacement of approximately 9 existing manholes, the installation of approximately 21 new manholes, the installation of approximately 12 new replumbed laterals, the replacement of approximately 62 laterals and the installation of new lateral clean outs where necessary. ",https://ceqanet.opr.ca.gov/2011091045/10,Alvarado 2nd Pipeline Extension,Karen Howard,City of San Diego,N/A,KHoward@sandiego.gov,"1222 1st Avenue, MS 501",,San Diego,CA,92101,6196875915,,San Diego,San Diego,San Diego,,92101,,,,,,,,,,,,,,,,,City of San Diego,Yes,1/8/2021,No,No,No,Subsequent Action,No,No,No,No,"1222 1st Avenue, San Diego, CA 92101"