SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2011088135,Hopland Public Utility District,,,Hopland Intertie,NOE,8/12/2011,8/12/2011,The project will intertie the Hopland Public Utility District water works with the Hopland Band of Pomo Indians (Tribe) existing water lines and water system. The construction that is envisioned by this agreement will consist of a pipe line that will connect to HPUD's existing eastern most extension of its pipeline in State Highway 175. The pipeline will then be extended along highway 175 to the eastern most boundary of the district it will then extend in a publically owned easement or right of way for a short distance where it will exit the HPUD boundary. The Tribe then will extend the pipeline from the boundary to the Tribe's existing pipeline. The entire length of the extension is approximately 700 feet from the existing terminus of the HPUD pipeline to the existing terminus of the Tribe's pipeline. The pipeline that is to be constructed inside the District's boundary will become the property of HPUD. The pipeline that is constructed outside the District's boundary will remain the property of the Tribe. At the completion of the proposed construction the trucking of water will end the Tribe will receive its wheeled federally reserved water right through the pipelines discussed above. A very small portion of the pipeline will be constructed outside of the Highway 175 right of way and extending from that right of way to the HPUD boundary. That short length of line is deminimus in length and its construction will have no significant or discernable effect on the environment.,https://ceqanet.opr.ca.gov/2011088135,Hopland Intertie,David Redding,Hopland Public Utility District,N/A,,P.O. Box 386,,Hopland,CA,95449,7074622666,,,Mendocino,,,,,,,,,,,,,,,,,Statutory Exemption,S: 21080.21,The project is exempt because the new underground pipeline to be installed is less than one mile long and all of the pipeline will be installed in public roads rights of way or easements.,,,,,,,,,,,,