SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2011088073,Caltrans 2 (Redding),"California Department of Transportation, District 2",,Buckhorn Closure - Geotechnical Studies - Phase 1,NOE,8/9/2011,8/9/2011,"Caltrans proposes to conduct seismic refraction studies from PM 0.75 to 2.5, on (SR) 299 in Shasta County. These geotechnical studies will measure sound waves on geological layers and rock/soil units in order to characterize the subsurface geologic conditions and geologic structure. The work will require brush and duff clearing five feet wide and up to a height of nine feet, laying electric cable and geophones on the ground, and transmitting seismic shock waves through the ground. The seismic shock will be provided by on e of the following methods: a hammer and metal plate; a blank shotgun shell placed down a hole, 2 to 3 feet in depth (2 inches in diameter; or a small amount of anfo explosive placed in a similar hole. These proposed studies are to be conducted in the summer and fall of 2011.",https://ceqanet.opr.ca.gov/2011088073,Buckhorn Closure - Geotechnical Studies - Phase 1,Tom Balkow,"California Department of Transportation, District 2",N/A,,Office of Environmental Management,P.O. Box 496073,Redding,CA,96049-6073,5302253405,,,Shasta,,,,,,,,,,,,,,,,,Categorical Exemption,C:6;S:15300,This project will not result in any significant impact to the environment.,,,,,,,,,,,,