SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2011088009,"Water Resources, Department of",California Department of Water Resources,DWR,Installation of Prospect Island Groundwater Monitoring Well No. 9 (PI-9),NOE,8/1/2011,8/1/2011,"Cone Penetration Testing (CPT) soundings will occur up to 100 feet deep. Monitoring well construction will then occur. This includes the installation of ¾-inch diameter polyvinyl chloride (PVC), a screen and blank well casing. The well (up to 75 feet bgs) will then be developed and used to monitor groundwater levels and water quality.",https://ceqanet.opr.ca.gov/2011088009,Installation of Prospect Island Groundwater Monitoring Well No. 9 (PI-9),Tyler Salman,California Department of Water Resources,N/A,,North Central Region Office,3500 Industrial Blvd.,West Sacramento,CA,95691,9163769645,,,Solano,,,,,,,,,,,,,,,,,Categorical Exemption,S:15304;S:15306,"This project involves construction of a groundwater well and basic data collection. DWR staff determines that the project will not result in major disturbances to an environmental resource. Groundwater sampling and water level monitoring will be conducted on a routine basis. There may be minor alterations in the condition of the land, but there will be no effect on sensitive resources.",,,,,,,,,,,,