SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2011071005,South Orange County Community College District,,,The Saddleback College Science Math Building Project Addendum to 2011 Facilities Master Plans Final EIR,NOD,3/26/2021,3/26/2021,"The Saddleback College Science Math Building Project site is 2.59 acres and includes the Science Math Building and surrounding areas east of Parking Lot 10, south of Library Road, and directly west of the Learning Resource Center (LRC). It also includes the pedestrian bridge that crosses Library Road from the Science Math Plaza that is on the east side of the Science Math Building. Consistent with the 2011 Facilities Master Plan, the Project would replace the existing aged Science Math Building facilities with new modern facilities that would meet current and future student and faculty needs. However, instead of extensive renovation of the existing 81,420 GSF building, the proposed Project will demolish the existing building and develop a new LEED Gold Equivalent three-story approximately 50,000 GSF building that will provide 32,500 ASF. The new building will be approximately 31,420 GSF smaller than the renovated structure that was included in the 2011 FMP. The new building includes classrooms, class labs, administrative and faculty office spaces, student study areas, meeting rooms, specialized distance education spaces, and building support. The new building accommodates technology and provides more efficient use of space and energy than the existing structure that was constructed in 1974. The proposed three-story building will be approximately 53 feet high. Level 1 will consist of approximately 17,400 GSF, Level 2 will consist of approximately 17,000 GSF, and Level 3 will consist of approximately 15,600 GSF. The new Science Math Building will be organized around a series of student study spaces that direct students between the lower level 1 building entry adjacent to Parking Lot 10 up three floors to the upper level and Science Math Plaza level that connects to other parts of the campus. The Project will also reconstruct the existing pedestrian bridge over Library Road connecting the Science Math Plaza to the Main Campus Quad and reconstruct the approximately 35,500 SF Science Math Plaza. The new pedestrian bridge will provide universal access across Library Road with an approximately 25-foot vertical grade change. Construction of the proposed project is anticipated to take 22-24 months. Construction of the Project includes demolition of the existing building, removal of the existing building foundation system, and 15 feet of over-excavation (approximately 49,175 cubic yards) and re-compaction of approximately 41,765 cubic yards of fill soils that are within the new building area. Construction includes export of approximately 7,410 cubic yards of soil and import of approximately 12,945 cubic yards of engineered fill. ",https://ceqanet.opr.ca.gov/2011071005/6,"Saddleback at ATEP Project, Culinary Arts (Building A) and Auto Tech (Building B)",Ann-Marie Gabel,"Vice Chancellor, Business Services",N/A,agabel@socccd.edu,28000 Marguerite Parkway,,Mission Viejo,CA,92692,9495824664,,Mission Viejo,Orange,Orange,"Marguerite Parkway, Avery Parkway",92692,2.59,,,,,,,,,,,,,,,,South Orange County Community College District,Yes,3/23/2021,No,No,No,Addendum,Yes,Yes,No,Yes,"Saddleback College, Health Sciences/District Offices Building, 28000 Marguerite Parkway, Mission Viejo, CA 92692"