SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2011061016,Snowline Joint Unified School District,,,Baldy Mesa Elementary School Solar Photovoltaic Project,MND,6/7/2011,,"The proposed project would consist of a 231-kilowatt (kW) direct current solar PV system at Baldy Mesa Elementary School, including 5 linear arrays and a 135 kW inverter. Panels would be ground-mounted on steel pile footings, tilted at 20-degrees (max. height of 7'8"" above grade). Ground cover ratio would be 35% over 1.11 acres. The project would include 321 yards of fencing, equipment concrete pads and shade structure, and 179 yards of utilities trenching. Construction period is estimated to be 10 weeks. Vehicle access would be provided by existing unpaved roads. No new permanent employees would be required. Limited amounts of water for cleaning (e.g., rinsing down) of solar PV arrays twice a year would be provided by 2,000-gal water truck.",https://ceqanet.opr.ca.gov/2011061016,Baldy Mesa Elementary School Solar Photovoltaic Project,Mike Schene,Snowline Joint Unified School District,N/A,,4075 Nielson Road,,Phelan,CA,92371,7608684706,34°26'19"N 117°27'15"W,Hesperia,San Bernardino,,Baldy Mesa Road/Phelan Road,92371,1.2,306-545-101,"Hwy 138, 18",CA Aqueduct,,Yes,6/7/2011,7/6/2011,Power,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,