SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2011051068,"Los Angeles, City of",City of Los Angeles,,Owens Dry Lake Phase 7a Dust Control Measures,NOP,5/25/2011,,"The City of los Angeles Department of Water and Power (LADWP) is currently implementing the Owens Lake Dust Mitigation Program (OLDMP) on Owens Dry Lake in order to reduce exceedances of the state and federal particulate matter (PM10) air quality standards. LADWP construct and operates dust control measures (DCMs) on the lake in compliance with Agreements with the Great Basin Unified Air Pollution Control District (GBUAPCD) under the authority of California Health & Safety Code Sec. 42316, legal settlement agreements with GBUAPCD, lease agreements for use of state lands (administered by the California State Lands Commission (CSLC)), and other regulatory approvals. Phase 7a will expand and modify the existing system of dust control on the lake by installation of Best Available Control Measures (BACM) (Gravel Cover, Shallow Flooding and Managed Vegetation) on 3.1 square miles of area identified as emissive by GBUAPCD. In addition, 3 to 4 sq miles of existing Shallow Flooding dust control areas (DCAs) will be transitioned to a Hybrid dust control method. Hybrid dust control is a new concept that will incorporate a combination of the three BACM to minimize dust while conserving water sue on Owens Dry Lake. ",https://ceqanet.opr.ca.gov/2011051068,Owens Dry Lake Phase 7a Dust Control Measures,Ms. Laura Hunter,City of Los Angeles Department of Water and Power,N/A,,111 North Hope Street,,Los Angeles,CA,90012,2133674096,,,Inyo,,Various,93549,5824,various,"Hwy 395, SR 136, SR 190","Owens Dry Lake, Owens River",,Yes,5/25/2011,6/23/2011,Other,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Cultural Resources, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife",,,,,,,,,,,,,,,,,