SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2011032032,"Toxic Substances Control, Department of",Department of Toxic Substances Control,,"Pacific Gas and Electric, Colusa, Former Manufactured Gas Plant Explanation of Significant Differences",NOD,8/13/2020,8/13/2020,"The Department of Toxic Substances Control (DTSC) approved an Explanation of Significant Differences (ESD) to the PG& E Colusa, Former Manufactured Gas Plant Remedial Action Plan (RAP) that was approved by DTSC on April 29, 2011. The 2011 RAP did not address contaminated soil where the active electrical equipment was in operation. The electrical substation occupies approximately 10,780 square feet of the eastern portion of the Project Site. PG&E is upgrading and replacing electrical distribution equipment within the electrical substation, which will allow a portion of the substation to be accessible for remedial excavation in the summer/fall of 2020. The additional remedial action within the Substation consists of the excavation and disposal of approximately 2,000 cubic yards of contaminated soil impacted with polycyclic aromatic hydrocarbons (PAHs), total petroleum hydrocarbons (TPHs), polychlorinated biphenyls (PCBs), arsenic, and lead. The onsite preparation, excavation, and subsequent backfill operations and restoration are estimated to take approximately 2.5 to 3 months. The Revised Project will be conducted under DTSC oversight in accordance with the DTSC-approved RAP (CH2M 2011) and the Remedial Design Implementation Plan (RDIP) Addendum 1 (ETIC 2020) approved by DTSC.",https://ceqanet.opr.ca.gov/2011032032/3,"Pacific Gas and Electric Company, Former Manufactured Gas Plant, Colusa",Karri Peters,Department of Toxic Substances Control,N/A,,Site Mitigation and Restoration Program,8800 Cal Center Drive,Sacramento,CA,95826,9162553614,,Colusa,Colusa,,,,,,,,,,,,,,,,,,,,DTSC,Yes,8/12/2020,Yes,No,Yes,,No,,No,Yes,"Department of Toxic Substances Control Site Mitigation and Restoration Program 8800 Cal Center Drive Sacramento, CA 95826 Additional project information is available on EnviroStor: www.envirostor.dtsc.ca.gov/public/"