SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2011021009,Bonita Unified School District,,BUSD,Bonita Center for the Arts,MND,2/4/2011,,"The proposed project consists of the construction of a performing arts center that will be known as the Bonita Center for the Arts (BCA), on the west side of the west side of the existing San Dimas High School campus. The footprint of the BCA will replace and occupy the school's southern parking lot. The project includes construction of a building that is approximately 25,000 square feet in size, and 75 feet tall at its highest point (top of parapet). The BCA will provide seating for approximately 700 people. The building also features an amphitheatre that is connected to the northeast side of the building. The amphitheatre will be designed to seat approximately 100 people. Two new parking areas will occupy 4,000 square feet of the project site on the south and east sides of the building. In addition, a new staff parking lot (36,360 square feet) will be constructed at the northeast corner of the school property on which is now an undeveloped landscaped portion of the school. The BCA will be used by all grade levels. If there is a demand for amateur and community theatre group performances at the BCA, it may be rented out on an as needed basis. Construction of the staff parking lot is anticipated to start in June 2012, with the BCA beginning in March 2012. Construction is anticipated to terminate in July 2013.",https://ceqanet.opr.ca.gov/2011021009,Bonita Center for the Arts,Ann Sparks,Bonita Unified School District,N/A,,115 W. Allen Avenue,,San Dimas,CA,91773,9099718200,,San Dimas,Los Angeles,,W. Covina Boulevard and Danecroft Avenue,91773,3.25,8385-011-910,SR-57,No,Brackett Field,Yes,2/4/2011,3/7/2011,Educational,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wildfire",,,,,,,,,,,,,,,,,