SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2011011005,Kern County,,,RE Rosamond One and RE Rosamond Two; Amendment No. 1 to Streambed Alteration Agreement No. 1600-2011-0178-R4,NOD,7/31/2014,7/31/2014,"The CDFW is issuing Amendment No. 1 to Streambed Alteration Agreement 1600-2011-0178-R4 to the Permittees, RE Rosamond One LLC and RE Rosamond Two LLC. The Project as originally permitted includes activities related to the construction and operation of a photovoltaic solar generation facility. Project components in jurisdictional areas include the removal of a 24-inch culvert at the northern boundary of the Project site, photovoltaic panel poles, and the construction of a maximum of nine (9), 15-foot-wide, at-grade service paths that cross Drainage 2. Electrical cable and wire trenches will be located within the service path footprint when they cross Drainage 2 and vegetarian removal and recontouring will occur over the entire length of Drainage 2 within the Project site. A total of 780 cubic yards of fill will be placed at multiple locations in Drainage 2 and a chain link security fence will cross Drainage 2 at the northern and southern Project site boundaries. Amendment No. 1 includes the extension of the deadline date from May 19, 2014 to May 19, 2015 to complete offsite mitigation.",https://ceqanet.opr.ca.gov/2011011005/5,RE Distributed Solar Project,Craig Bailey,CDFW,N/A,,1234 East Shaw Avenue,,Fresno,CA,93710,"559-243-4014, ext. 227",,Bakersfield,Kern,,"(1,2) Favorito Ave and Gillman Ave; (3) Highline Road and Bailey Road; Baumbach Ave and Pellisie",93301,1709,"(1,2) 252-013-01; (3) 448-052-35-42; (4) 448-051-30, 31 448-051-69-74",Hwy 14,,,,,,,,,,,,,,CDFW ,No,7/29/2014,No,Yes,No,,Yes,,No,Yes,"Kern County Planning Department, 2700 ""M"" Street, Suite 100, Bakersfield, CA 93301-2370"