SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010122094,Contra Costa Water District,,,Mallard Slough Rehabilitation Project,MND,12/30/2010,,"The proposed project is a maintenance project to dredge accumulated mud and sediment in a 3,000-ft long by 40-ft wide (bottom width) trench along the length of the intake channel. The proposed project depth to negative six feet mean lower low water (MLLW)^1 with a two-ft overdredge is most similar to a previous maintenance dredge event in 1968, and would excavate ~ 41,600 cubic yards (cy) of sediment (which includes a 25% buffer) from the pump station intake channel. Figure 3 outlines the dredge limits from 1968 and 1987 along with the limits for the proposed project. On September 20, 2010 the Dredge Material Management Office (DMMO) advised that 26,000 cubic yards of sediment (which includes a 25% buffer) be disposed of in open water (SF-9) and that 15,600 cubic yards (which includes a 25% buffer) be disposed of at an approved upland location.",https://ceqanet.opr.ca.gov/2010122094,Mallard Slough Rehabilitation Project,Mark Seedall,Contra Costa Water District,N/A,,P.O. Box H20,,Concord,CA,94524-2099,9256888119,,Pittsburg,Contra Costa,,Suisun Ave at Poinsella Ave,,2.75,096-100-017 and 018,SR 4,Mallard Slough/Suisun Bay,Buchanan Field,No,12/30/2010,1/28/2011,Water Facilities,,"Biological Resources, Cultural Resources, Hazards & Hazardous Materials, Hydrology/Water Quality",,,,,,,,,,,,,,,,,