SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010122037,Midpeninsula Regional Open Space District,,,Mount Umunhum Environmental Restoration and Public Access Project (Phase 1 Demolition),FIN,5/25/2012,,"Note: FYI Final The project includes phased public access to the summit of Mount Umunhum, as well as roadway and access improvements, ecological restoration, and development of public use facilities and a range of possible amenities such as trails, observation and reflection areas, interpretive displays, picnic tables, shade structures, restrooms, camp sites, hang glider facilities, and a visitor center. The project also includes longer term plans to allow public access to the summit of Mount Thayer from the Lexington Basin. No access to Mount Thayer from Mount Umunhum is proposed as part of this project. Implementation of the proposed project includes demolition of most, possibly all, of the existing structures associated with the former Almaden Air Force Station located at the site. The project includes three alternatives for the treatment of the existing radar tower.",https://ceqanet.opr.ca.gov/2010122037/3,Mount Umunhum Environmental Restoration and Public Access Project,Meredith Manning,Midpeninsula Regional Open Space District,N/A,,330 Distel Circle,,Los Altos,CA,94022,6506911200,37°09'38"N 121°53'51"W,Los Gatos,Santa Clara,,Mount Umunhum Road and Hicks Road,95033,22.8,"562-08-003, -004, and 562-09-050",,"Los Gatos Creek, Alamitos Creek, and Guadalupe Creek",,No,5/25/2012,6/12/2012,Recreational,Site Plan,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,