SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010122006,San Mateo-Foster City School District,,,College Park Elementary School Modernization,MND,12/2/2010,,"The proposed project is the demolition of several permanent and portable classroom buildings and replacement with new permanent buildings. Twelve portable classrooms (totaling 11,520sf), one pre-fabricated six-classroom building (7,000sf), and a 2,040sf portion of the LGI would be removed. A new administration building (2,005sf), three classroom wings with 17 classrooms (24,502sf) would be constructed. A new lunch shade structure would be constructed next to the LGI. The remaining classroom buildings would be modernized without any expansion. The existing Turnbull Child Development Center administration portable buildings would be relocated within the project site and another portable classroom building (1,440sf) would be relocated from the Fiesta Gardens site. Portions of the project site would be re-landscaped. Student capacity would increase from 550 to 745. A new drop-off pick-up lane and shelter would be built within the project site to serve the District's students.",https://ceqanet.opr.ca.gov/2010122006,College Park Elementary School Modernization,Alex Kristal,San Mateo-Foster City School District,N/A,,1410 South Amphlett Blvd,,San Mateo,CA,94402,6503127880,,San Mateo,San Mateo,,"Poplar Avenue, North Humboldt Street, Indian Avenue, El Dorado Street",94402,7.5,033-041-050,U.S. 101; SR 82,San Francisco Bay,,Yes,12/2/2010,12/31/2010,Educational,,"Biological Resources, Flood Plain/Flooding",,,,,,,,,,,,,,,,,