SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010121070,"Public Health, Department of",California Department of Public Health,CDPH,Plant F41A Replacement Project,NOD,4/6/2011,4/6/2011,"The FWC water supply system includes 34 operating groundwater wells which supply water to the FWC system. One of the existing FWC wells, Well F41A, was constructed in 1925and has been producing water from the Lytle Creek Groundwater Basin (Lytle Creek Basin) for more than 85 years. While attempting to refurbish existing WellF41A, FWC determined the existing well casing had collapsed. The age of the well and the weakness of the casing, combined with the loss of water flow from the well after relining, make it impractical to refurbish the existing well and more economical and water production efficient to abandon the existing well and construct a new replacement well. Existing Well F4iA is no longer serviceable and has been taken out of production by FWC. FWC has selected a site that meets the identified criteria for location of the replacement well. FWC has designated the replacement site as Plant F54A and designated replacement well as Well F54A. In addition to constructing and operating the replacement well, this project will include the installation of an underground water pipeline to connect the new Plan F54A Well to FWC's existing water distribution system. The existing Plant F41A Well will be abandoned and filled in accordance with CDPH standards for the destruction of water production wells.",https://ceqanet.opr.ca.gov/2010121070/2,Plant F41A Replacement Project,Kelvin Yamada,California Department of Public Health,N/A,,"1616 Capitol Avenue, MS 7418 (PO BOX 997377)",,Sacramento,CA,95899-7377,9164495624,,Fontana,San Bernardino,,Riverside Avenue/Insitution Road,92337,,,Hwy 10,Lytle Creek,,,,,,,,,,,,,CA Dept. of Public Health ,Yes,3/21/2011,No,No,Yes,,Yes,,No,,