SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010121019,Imperial Irrigation District,,,ID 230kV Transmission Line and Substation Expansion - Imperial Valley to Dixieland Substations,MND,12/8/2010,,"Proposed construction of a 230kV transmission line and substation improvements between the Imperial Valley and Dixieland Substations. The transmission line route would be approximately 7 miles long in unincorporated Imperial County largely on federal lands managed by the Bureau of Land Management. A new, approximately 140-foot (ft) right-of-way from the Bureau of Land Management would be necessary to accommodate the transmission line route. The project would include 53 pole structures to support the line and a 16-ft wide maintenance road. Substation improvements would involve a 300 ft by 180 ft eastward expansion of the Dixieland Substation at the northern end of the transmission line route, and a new Liebert Substation immediately north of the existing Imperial Valley Substation at the southern end of the route.",https://ceqanet.opr.ca.gov/2010121019,ID 230kV Transmission Line and Substation Expansion - Imperial Valley to Dixieland Substations,Donald Vargas,Imperial Irrigation District,N/A,,P.O. Box 937,,Imperial,CA,92251,7604823609,,El Centro,Imperial,,,,,,Hwy 8,Dixie Drain,,Yes,12/8/2010,1/6/2011,Power,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Transportation, Vegetation",,,,,,,,,,,,,,,,,