SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010118045,"Water Resources, Department of",California Department of Water Resources,DWR,Notice of Exemption for the Colusa County River Rd. Groundwater,NOE,11/2/2010,11/2/2010,"The monitoring well will be drilled with truck-mounted direct rotary drill rig equipped with mud pump. All drilling mud will be contained in a recirculation system with drilling cuttings and sand being placed on the ground of a parking area on-site near the shaker system. Drilling mud will be contained on site and disposed of in an approved location by the driller. Additional equipment that may be onsite includes a water truck, a front-end loader and flat-bed trucks to transport materials as needed. Access for these vehicles will be directly on the levee road. The area to be occupied by the drill rig may require that installation of a 6-inch thick gravel pad depending on quantity and magnitude of wet winter weather. The drilling rig and associated equipment will occupy an area of approximately 80 feet by 40 feet. Well construction will occur during December 2010.",https://ceqanet.opr.ca.gov/2010118045,Notice of Exemption for the Colusa County River Rd. Groundwater,Thomas L. Boullion,California Department of Water Resources,N/A,tomb@water.ca.gov,Northern Region Office,2440 Main Street,Red Bluff,CA,96080,5305297307,,,Colusa,,,,,,,,,,,,,,,,,Categorical Exemption,"15306, 15304","Section 15306, Basic data collection, research, experimental management, and resource evaluation activities, which do not result in a serious or major disturbance of an environmental resource. Section 15304 (f), Minor trenching and backfilling where the surface of the land is restored and the project does not involve the removal of healthy, mature, scenic trees.",,,,,,,,,,,,