SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010111082,Los Angeles County,,,"Alpine Solar Project, PN: R2009-02089, CUP: RCUPT200900158, ENV: RENVT200900128",MND,11/19/2010,,"NRG Solar Alpine LLC (the Project Sponsor) proposes to construct, own, and operate a renewable energy project providing electricity generated from clean solar technology. The Alpine Solar Project (ASP or Project) will consist of a nominal 92-megawatt (MW) alternating current (AC) solar photovoltaic (PV) generating facility located on approximately 580 acres of developable area of the approximately 800-acre Project site. The Project site includes two distinct areas, defined for the purpose of this document as the Western Parcel (approximately 600 acres) and the Eastern Parcel (approximately 200 acres). The power generated by the Project will be delivered from the Project site to the California Independent System Operator (CAISO) grid by constructing two new 66-kV generation tie-lines to the Neenach Substation, which is owned and operated by Southern California Edison (SCE). The 66-kV transmission lines for the Project will be located adjacent to the West Avenue C and 210th Street West (currently unpaved roads) and will extend from the Project site to the Neenach Substation.",https://ceqanet.opr.ca.gov/2010111082,"Alpine Solar Project, PN: R2009-02089, CUP: RCUPT200900158, ENV: RENVT200900128",Anthony Curzi,Los Angeles County,N/A,,320 West Temple Street,,Los Angeles,CA,90012,2139746461,34°47'02"N 118°30'11"W,,Los Angeles,,210 Street West and Avenue C,93536,800,Multiple,Hwy 138,,,No,11/22/2010,12/21/2010,Power,,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,