SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010111065,"Public Utilities Commission, California",California Public Utilities Commission,CPUC,Hollister 115 kV Power Line Reconductoring Project,FIN,1/6/2011,,"Pacific Gas and Electric Company (PG&E), in its California Public Utilities Commission (CPUC) application (A.09-11-016), filed on November 23, 2009, seeks a Permit to Construct the Hollister 115 kV Power Line Reconductoring Project (Proposed Project). PG&E, which currently operates the existing 115 kV overhead electric power line system in Monterey and San Benito Counties, requests to replace structures (e.g., towers and poles) and reconductor the Hollister Tower and Hollister Pole Segments, approximately seven and nine miles long, respectively. The majority of the proposed alignment would be located in an existing PG&E easement on private property; an approximately 1.3-mile section of the 115kV Hollister Pole Segment would be relocated out of the San Benito River floodplain (the existing river alignment) to a new river crossing with structure located on dry banks above the river (the Proposed River Crossing) while the existing distribution and topped poles would remain to serve local users.",https://ceqanet.opr.ca.gov/2010111065/2,Hollister 115 kV Power Line Reconductoring Project,Mary Jo Borak,California Public Utilities Commission,N/A,,505 Van Ness Avenue,,San Francisco,CA,94102-3298,4157031333,36°52'18"N 121°24'28"W,"Hollister, San Juan Bautista","Monterey, San Benito",,"Multiple (Substation at Bolsa Road, San Felipe Road)",95023,,Multiple,"Hwy 156, 25, 129, 101",San Benito River,Hollister Municipal,No,,,Power,,"Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife",,,,,,,,,,,,,,,,,