SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010101087,"Riverside, City of",City of Riverside,,Van Buren Boulevard Widening from Jurupa Avenue to the Santa Ana River Bridge (EPW-10-002),NOD,5/17/2011,5/17/2011,"Environmental review of a proposal by the Public Works Department to widen approximately 0.30 mile of Van Buren Boulevard between Jurupa Avenue and the Santa Ana River Bridge. Proposed improvements include, but are not limited to, widening Van Buren Boulevard between Jurupa Avenue and the Santa Ana Bridge to accommodate the ultimate roadway configuration of three travel lanes in each direction with a raised center median, installation of concrete curb and sidewalk, drainage improvements, retaining walls, and reconstruction of portions of the existing bike path. Similar to road widening projects directly to north and south, Van Buren Boulevard will be striped for three lanes in each direction at Jurupa Avenue and transition to two lanes in each direction near the Santa Ana River Bridge. The improvements are proposed to reduce traffic congestion and accommodate future traffic growth. The widening will require right of way acquisition from one parcel. ",https://ceqanet.opr.ca.gov/2010101087/2,Van Buren Widening from Jurupa Avenue to the Santa Ana River Bridge,Debbie Anderson,"City of Riverside, Public Works Department/Engineering Division",N/A,,3900 Main Street,,Riverside,CA,92522,9518265517,33°57'38"N 117°27'51"W,Riverside,Riverside,,Jurupa Avenue,92523/504,0.6,163-300-010,No,,Riverside Municipal,,,,,,,,,,,,Riverside City Council ,Yes,5/10/2011,No,No,Yes,,Yes,,No,Yes,"City of Riverside Public Works Department 3900 Main Street Riverside, CA 92522"