SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010101075,"Public Utilities Commission, California",California Public Utilities Commission,CPUC,Aliso Canyon Turbine Project,NOP,10/25/2010,,"Construction of the proposed on-site Central Compressor Station. Relocation of on-site office trailer facilities and an on-site guard house. Construction of a new on-site, 4 circuit, approximately 2,000 sf 12-kilovolt (kV) Plant Power Line (PPL. Construction of the proposed on-site SCE Natural Substation including foundation and equipment pads, electrical equipment, installation of securite perimeter wall/chain link fence, access road, and capacitor bank (additional elements may be included. Construction of both on-site and off-site electric modifications to 2 existing SCE 66-kV subtransmission lines (up to ~12 miles long). Conduct off-site substation modifications at 3 existing SCE substations (Newhall, Shatsworth, and San Fernando Substations) that support 2 existing SCE 66-kV subtransmission lines.",https://ceqanet.opr.ca.gov/2010101075,Aliso Canyon Turbine Project,Andrew Barnsdale,California Public Utilities Commission,N/A,AlisoCanyonNG@ene.com,Energy Commission,"505 Van Ness Avenue, 4th Floor",San Francisco,CA,94102,4157033221,34°18'26"N 118°33'06"W,"Los Angeles, Santa Clarita, Simi Valley","Los Angeles, Ventura",,Senson Blvd and Tampa Ave,91326,,"Multiple, including 282-100-580 (central)","Hwy 118, 14","Santa Clara River (Upper), Los Angeles Reservoir",,Yes,10/25/2010,11/23/2010,"Other, Power",Grading Permit,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,