SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010098053,"Water Resources, Department of",California Department of Water Resources,DWR,Cal Trans District 11 Headquarters Central Plan - Chiller Replacement with Variable Pumping and Controls,NOE,9/3/2010,9/3/2010,"The project proposes an Energy Conservation Measure (ECM) for this facility, which includes three inter-related parts. Replace the existing 102-ton air cooled screw chiller with a new 210-ton, water cooled ""TurboCor"" chiller, complete with a new condenser water pump with variable frequency drive (VFD) and piping and associated equipment to be connected to the existing condenser water system that is serving the centrifugal chillers. Convert the existing primary-secondary pumping system to a ""variable primary"" pumping system. This consists of installing VFDs on the constant volume pumps including the primary chilled and condenser water pumps. Install a control system to optimize the central plant chilled and condenser water equipment, including all chillers, cooling towers, and pumps. The system will interface with the existing Metasys system and will be programmed to achieve optimal chiller sequencing based on actual loading and performance models. This ECM will provide energy efficiency upgrades. The existing units are corroded and inefficient. Replacing the units with new equipment will result in energy savings, because the current units are less efficient that the modern equipment. The construction contractor will follow any hazardous material waste handling and disposal with respect to appropriate local, state, and federal rules/regulations.",https://ceqanet.opr.ca.gov/2010098053,Cal Trans District 11 Headquarters Central Plan - Chiller Replacement with Variable Pumping and Controls,Adbi Farhang,California Department of Water Resources,N/A,,1416 Ninth Street,,Sacramento,CA,95814,9163765314,,San Diego,San Diego,,,,,,,,,,,,,,,,,Categorical Exemption,"15301, 15302","The project is consistent with the original proposed usage and meets the requirements set forth in Sections 15301 and 15302, and that no exceptions to the exemptions are applicable. The project will have negligible effect on resources in the area and no expansion of use beyond that currently existing.",,,,,,,,,,,,