SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010092040,Sacramento Regional Sanitation District,,,Sump 119 Outfall Demolition,NOD,3/27/2012,3/27/2012,"The Sacramento Regional County Sanitation District (SRCSD) proposes the removal of six abandoned bents and two groups of dolphin piers from the Sacramento River, Installed in 1946, the bents once supported a 30-inch-diameter sewer force main within the river, which has since been demolished. The pilings for each bent and dolphin piers were embedded into the river bed a minimum of 20 feet until a minimum bearing of 10 tons was established. The demolition of the existing structures will attempt to remove each piling intact. If the entire length of the piling cannot be extracted, the piling will be cut below the existing river bed and abandoned in place. If necessary project demolition will include excavation to expose the concrete blocks. Once the concrete is removed the remaining piles and dolphin piers will be extracted using a clamp and vibratory extractor. Engineered backfill will be required for excavation on the river bank. The Bents that remain will be removed with a barge mounted crane, clamp, and vibratory extractor. No backfill is aniticpated for these bents.",https://ceqanet.opr.ca.gov/2010092040/2,Sump 119 Outfall Demolition,Joyce Horizumi,County of Sacramento,N/A,,"827 Seventh Street, Room 220",,Sacramento,CA,95814,9168747914,38°31'24.03"N 121°31'26.35"W,Sacramento,Sacramento,,Riverside Boulevard/ 35th Avenue,95822,,"029-0021-041, 029-0021-056, and 029-0021-047",I-5,Sacramento River,Sacramento Executive,,,,,,,,,,,,County of Sacramento ,Yes,12/7/2010,No,No,Yes,,Yes,,No,No,