SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010091080,"Whittier, City of",City of Whittier,,Whittier Boulevard Specific Plan Amendment,SIR,2/28/2011,,"The Whittier Boulevard Specific Plan was adopted by the City in 2005. The WBSP was intended to guide future development within the Whittier Boulevard corridor and facilitate change in development patterns within the project area. The primary goal of the 2005 SBSP was to bring forward the true character of the City within the Whittier Boulevard corridor, by developing tightly-woven neighborhoods, distinct residential uses, and extensive streetscape improvements. The 2005 WBSP included measures to redefine and redistribute land uses, implement infrastructure improvements, and provided a range of updated design standards. The City intends to amend the existing WBSP to account for changes in the local economy and existing conditions that have occurred within the WBSP corridor since 2005. The City initiated the process to update the 2005 WBSP in 2009 when the City Council directed City staff to provide limited amendments to provide clarity in development standards and permitted land uses, correct mapping errors, and provide modifications/re-designation of the WBSP Commercial Expansion/Auto Sales Segment: The WBSP Amendment is proposed by the City to best serve the project area based on changes that have occurred since 2005. ",https://ceqanet.opr.ca.gov/2010091080/2,Whittier Boulevard Specific Plan Amendment,Don Dooley,City of Whittier,N/A,ddooley@cityofwhittier.org,13230 Penn Street,,Whittier,CA,90602,5625679340,33°59'9.47"N 118°3'29.42"W,Whittier,Los Angeles,,Numerous (Whittier Blvd corridor),90602,496,Numerous,"SR 72, I-605",San Gabriel River,,Yes,2/28/2011,4/13/2011,"Commercial, Industrial, Office, Residential",Specific Plan,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife",,,,,,,,,,,,,,,,,