SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010088113,"Motor Vehicles, Department of",California Department of Motor Vehicles,DMV,"Chula Vista Office Building Lighting, Ventilation and Irrigation Upgrades",NOE,8/9/2010,8/9/2010,"The project proposes three Energy Conservation Measures (ECMs) for the DMV's Chula Vista Field Office site. The first measure (lighting) includes replacing existing inefficient indirect light fixtures with lower wattage higher efficiency light fixtures throughout the building. This ECM will provide energy efficiency upgrades. The second measure includes replacing five packaged rooftop HVAC units with new high efficiency equipment. The existing unity are old, inefficient and at the end of their useful lives. Replacing the units with new equipment will result in energy savings, because the current units are less efficient than the modern equipment. The third measure (Irrigation) includes the site's irrigation control system upgrade with weather based irrigation controllers and software. This irrigation control system will be internet based, allowing for automatic adjustments for daily scheduling, cycling, and soaking, thus preventing excess water use. The construction contractor will follow any hazardous material waste handling and disposal with respect to appropriate local, state, and federal rules/regulations.",https://ceqanet.opr.ca.gov/2010088113,"Chula Vista Office Building Lighting, Ventilation and Irrigation Upgrades",Valerie Namba,Department of Motor Vehicles,N/A,,2415 First Avenue,Mail Station F101,Sacramento,CA,95818,9163761607,,Chula Vista,San Diego,,,,,,,,,,,,,,,,,Categorical Exemption,"15301, 15302",The replacement activity is consistent with original proposed usage and meets the requirements set forth in Section 15301(a) for interior of exterior alterations involving such things as electrical conveyances and set forth in Section 15302(c) for existing utility systems and facilities. The project will have negligible effect on resources in the area.,,,,,,,,,,,,