SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010081076,Buena Vista Water Storage District,,,BV8 State Water Project Turnout (California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2011-056-04,NOD,6/20/2012,6/20/2012,"The Notice of Determination is for the Amended ITP No. 2081-2011-056-04 Amendment No. 1. The amended ITP adds giant kangaroo rat (Dipodomys ingens) to the Covered Species list. The proposed Project includes the construction of a new water turnout on the Department of Water Resources' (DWR) California Aqueduct to deliver water into Buena Vista Water Storage District's (BVWSD) West Side Canal via a new underground pipeline and outlet structure. The turnout will be constructed on the east bank of the Aqueduct consisting of a 78 inch by 78 inch sluice gate and appurtenances. Within the DWR's right-of-way there will also be a meter vault, instrument building and appurtenances. An underground pipeline will connect the turnout structure to the outlet structure on the West Side Canal. The pipeline will be approximately 1,510 feet long and 78-inch diameter reinforced concrete pipe. The trench required for pipe installation will be approximately 30 feet wide by 13 feet deep with a temporary construction easement of 100 feet wide along the length of the pipeline. The pipeline will run underground across the Kern River Flood Channel.",https://ceqanet.opr.ca.gov/2010081076/8,BV8 State Water Project Turnout,Brandon Sanderson,Department of Fish and Game (DFG),N/A,,Central Region,1234 East Shaw Avenue,Fresno,CA,93710,8055946141,35°19'41.40"N 119°24'36.05"W,,Kern,,,93206,,"159-140-09, 159-130-03",No,"California Aqueduct, Kern River Flood Channel, West Side Canal, Short Main Canal, Arizona Canal,",No,,,,,,,,,,,,DFG ,No,6/11/2012,No,No,Yes,,Yes,,No,No,"Buena Vista Water Storage District P.O. Box 756 Buttonwillow, CA 93206"