SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010071021,San Bernardino International Airport Authority,,,"South Drainage Channel, Channel Hardening and Erosion Control",MND,7/7/2010,,"The SBIAA proposes to modify the existing man-made South Drainage by installing a concrete channel floor for the westerly 3,000 feet of channel and by installing concrete check dams and related energy dissipaters approximately every 200 feet along the eastern 2,500 feet of channel. The new channel floor pavement along the westerly 3,000 feet of the Channel has been estimated to encompass about 31,950 sf. The installation of the check dams (12) in the eastern segment has two purposes: to slow the velocity of the flow and to create ponded areas within the channel to offset the loss of existing percolation function for the western 3,000 feet of Channel that will undergo replacement of the existing soft channel bottom with a concrete bottom.",https://ceqanet.opr.ca.gov/2010071021,"South Drainage Channel, Channel Hardening and Erosion Control",Mike Burrows,San Bernardino International Airport Authority,N/A,,"294 S. Leland Norton Way, Suite 1",,San Bernardino,CA,92408,9093824100,35°05'32"N 117°14'10"W,San Bernardino,San Bernardino,,S Leland Norton Way,92408,,,I-10,"unnamed, man-made tributary of Santa Ana River",San Bernardino International,Yes,7/7/2010,8/5/2010,Other,,"Air Quality, Biological Resources, Drainage/Absorption, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality",,,,,,,,,,,,,,,,,