SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010061016,Victor Valley Wastewater Reclamation Authority,,,Nanticoke Pump Station Bypass Sewer Line Project,NOD,9/2/2010,9/2/2010,"The VVWRA in collaboration with its member agency, the Town of Apple Valley, has developed a strategic goal of upgrading the sewer and treatment systems within the Victor Valley in order to optimize the efficient re-use of reclaimed water. The proposed project would re-route part of the existing sewage collection system in the Town of Apple Valley. It consists of construction and installation of ~2.89 miles of 30 inch sewer line from the existing Nanticoke Road sewer pump station to the existing Otoe Road sewer pump station next to Brewster Park. The Authority proposes to implement the project to ensure systems essential to water reuse are available at a long-term cost and energy savings over what are currently in place. The Nanticoke pump station is nearing the end of its useful life and either needs to be renovated or replaced with a functionally equivalent alternative (a facility that will help convey sewage to a wastewater treatment plant).",https://ceqanet.opr.ca.gov/2010061016/2,Nanticoke Pump Station Bypass Sewer Line Project,Logan Olds,Victor Valley Wastewater Reclamation Authority,N/A,,"15776 Main Street, Suite 3",,Hesperia,CA,92345,7609489849,34°32'23"N 117°11'26"W,Apple Valley,San Bernardino,,Elkado and Naticoke Rd / Brewster Park on Otoe Rd,92345,~2.89 miles,,I-15,Mojave River,Apple Valley,,,,,,,,,,,,VVWRA ,Yes,8/19/2010,No,No,Yes,,Yes,,No,,"VVWRA 15776 Main St, Suite 3 Hesperia, CA 92345"