SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010042019,"Mountain View, City of",City of Mountain View,,Downtown Family Development Project,MND,4/6/2010,,"ROEM Development Corporation proposes to redevelop the site with a residential housing complex that includes up to 51 residential units over a subsurface parking garage. Fifty of the units would be affordable to lower income families earning up to 50 to 60 percent of the Area Median Income. One unit would be designated for an on-site building manager. The residential complex would consist of a three to four story ""C"" shaped building sited around an internal courtyard. Between 8,800 and 10,000 sf of active and passive open space would be provided for use by project residents. The subterranean garage would be accessed by a private two-way ramp at West Evelyn Avenue. At least 92 parking spaces (1.8 spaces per unit), including as many as 14 tandem and 4 ADA-accessible garage spaces would be provided. Up to 5 at-grade spaces would be provided at the south end of the site. The project would remove 2 of the 13 existing street trees located on the site.",https://ceqanet.opr.ca.gov/2010042019,Downtown Family Development Project,Adriana Garefalos,City of Mountain View,N/A,,Community Development Department,P.O. Box 7540,Mountain View,CA,94039-7540,6509036459,32°33'40.6464"N 122°4'43.6434"W,,Santa Clara,,Franklin St/West Evelyn Ave,94039,1.03,158-15-025,"US 101, SR 85, SR 237",Stevens Creek,Moffett Airfield,No,4/6/2010,5/5/2010,Residential,"Planned Unit Development, Site Plan","Air Quality, Biological Resources, Cultural Resources, Drainage/Absorption, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Septic System, Wildlife",,,,,,,,,,,,,,,,,