SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010031008,San Benito County,,,Panoche Valley Solar Farm Project,FIN,4/14/2015,,"FYI Final The applicant, Panoche Valley Solar LLC, proposes modifications to the Panoche Valley Solar Project Use Permit 1023-09 approved in 2010. In general, the project has been reduced in size from a 399 MW project to a 247 MW project and will be constructed over a shorter 18-mont timeframe as opposed to the previously approved 5-year construction period. The applicant is also proposing revisions to various project components based on the reduced project size and revisions to previously approved Applicant Proposed Measures and Mitigation Measures based on more refined engineering and construction techniques. In addition, PG&E has identified specific telecommunication upgrades that are required to serve the project and are under the jurisdiction of California Public Utilities Commission that will be located partially in San Benito County and partially in Fresno County.",https://ceqanet.opr.ca.gov/2010031008/8,Panoche Valley Solar Farm Project,Michael Krausie,San Benito County,N/A,,2301 Technology Parkway,,Hollister,CA,95023,8316375313,36°38'11"N 120°52'42"W,,San Benito,,Panoche Road and Little Panoche Road,95043,2506,Multiple,No,"Panoche Creek, Las Aguilas Creek",No,No,,,Power,Use Permit,"Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire",,,,,,,,,,,,,,,,,