SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2010021023,San Bernardino Valley Municipal Water District,,,SBVMWD Baseline Feeder Well Replacement Project,MND,2/8/2010,,"Reference SCH#1988121892 In August 2005 the 9th Street Well became inoperable due to a deteriorated well casing. In December 2005, the Perris Street Well Screen became clogged and became inoperable and is planned to be rehabilitated and down-sized (from up to 5,000 gallons per minute to 2,500 gallons per minute) The proposed project, the Baseline Feeder Well Replacement Project, would support continued production and distribution of portable water to District customers in the western portion of its service area by replacing the well production capacity lost from the 9th and Perris Street Wells. In order to replace the lost capacity of up to 7,000 gallons per minute from the 9th Street and Perris Street wells, the District proposes to develop two replacement wells and associated facilities on the Lytle Creek Alluvial Fan. The two wells proposed would each have a rated capacity of 2,500-3,500 gallons per minute. ",https://ceqanet.opr.ca.gov/2010021023,SBVMWD Baseline Feeder Well Replacement Project,Wen Huang,San Bernardino Valley Municipal Water District,N/A,,380 East Vanderbilt Way,,San Bernardino,CA,92408,9093879223,34°06'53"N 117°19'38"W,San Bernardino,San Bernardino,,9th Street/ N. California & Baseline Road,,,0139-341-12 / 0269-181-04,"10, 210 and 215","Lytle Creek, Cajon Wash",,Yes,2/8/2010,3/9/2010,"Other, Water Facilities",,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Public Services, Solid Waste, Transportation, Vegetation, Wildlife",,,,,,,,,,,,,,,,,