SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2009122075,"San Francisco, City and County of",City and County of San Francisco,,San Francisco Groundwater Supply Project,NOD,2/22/2014,2/22/2014,"The San Francisco Public Utilities Commission is proposing a project which provides an average of four million gallons per day of groundwater to San Francisco's municipal water supply Groundwater would be blended with San Francisco's existing municipal water supply system for distribution within San Francisco. The project consists of the construction and operation of six potable groundwater well facilities - two that would be converted from existing irrigation well facilities and four that would be newly constructed. Each facility would include a groundwater production well and a pump station. The SFPUC would also construct a distribution system (including pipelines and connection points) that would connect five of the well facilities to Sunset Reservoir; the sixth well would connect to the existing Lake Merced Pump Station, and would require a short length of distribution piping to make this connection. The groundwater would be pumped from the North Westside Groundwater Basin, which is located within the larger Westside Groundwater Basin and underlies parts of San Francisco and San Mateo Counties.",https://ceqanet.opr.ca.gov/2009122075/4,San Francisco Groundwater Supply Project,Tim Johnston,City and County of San Francisco,N/A,timothy.johnston@sfgov.org,"1650 Mission Street, Suite 400",,San Francisco,CA,94103-2479,4155759035,37°45'22"N 122°29'56"W,San Francisco,San Francisco,,Various,Various,~4,Various,"Routes: 1, 35, and 280","Pacific Ocean, Lake Merced, Spreckels Lake, Stow Lake and Chain of lakes",,,,,,,,,,,,,San Francisco Public Utilties Commission ,No,1/14/2014,Yes,Yes,No,,Yes,,Yes,Yes,"San Francisco Planning Department, 1650 Mission St., Suite 400, San Francisco CA 94103"