SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2009122006,"San Francisco, City and County of",City and County of San Francisco,,Cesar Chavez Street Sewer System Improvement Project,MND,12/2/2009,,"NOTE: Review Per Lead The project includes improvements to existing sewer lines in the Mission District and lower Bernal Heights area of San Francisco to increase reliability and minimize potential flooding. The alignment spans Cesar Chavez St. from Hampshire St. to San Jose Ave., Harrison St. from Cesar Chavez to 26th St., Valencia St. from Cesar Chavez to Mission St., Mission St. at Cesart Chavez and Fair Ave., Tiffany Ave. at the intersection of Valencia and Duncan St., Fair Ave. from Mission to Coleridge St., Coleridge St. from Fair Ave. to Coso Ave., and Coso Ave. from Coleridge St. halfway to Mirabel Ave. The project proposes a new 72 to 84 inch diameter auxiliary sewer beneath Cesar Chavez St., relining of the existing sewer under Cesa Chavez St., and replacement of the existing sewers along other project streets with larger diameter pipelines.",https://ceqanet.opr.ca.gov/2009122006,Cesar Chavez Street Sewer System Improvement Project,Michael Jacinto,City and County of San Francisco,N/A,,"1650 Mission Steet, Suite 400",,San Francisco,CA,94103,4155750903,,San Francisco,San Francisco,,"Cesar Chavez St., Harrison St, Mission St, Valencia St, Fair Ave, Coleridge St, Coso Ave",,6000 linear ft,,"101, US 280","Islais Creek Channel, SF Bay",,Yes,12/2/2009,1/4/2010,Other,,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Sewer Capacity, Solid Waste, Transportation, Vegetation",,,,,,,,,,,,,,,,,