SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2009092024,"Pinole, City of",City of Pinole,,Pinole-Hercules Water Pollution Control Pollution Control Plant Improvement Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-7883-110,NOD,6/14/2016,6/14/2016,"The Project consists of various improvements to the Pinole-Hercules WPCP necessary to provide full secondary treatment for influent flows up to 20 million gallons per day (mgd), to discharge treated effluent up to 13.9 mgd to the Deep Water Outfall, and to limit use of the Emergency Outfall to flows in excess of 13.9 mgd. The Project will include construction of a new influent pump station/headworks facility and a new Solids Handling Facility, along with upgrades to the secondary treatment facilities , electrical facilities, and effluent pump stations. The Project generally involves site preparation, grading, excavation, backfilling, building construction, and installation of pipelines within the WPCP deed line. All proposed improvements will occur within the existing developed footprint of the WPCP site and no in-water construction activities will occur as part of the Project.",https://ceqanet.opr.ca.gov/2009092024/10,Pinole-Hercules Water Pollution Control Plant Improvement Project,Carina Grove,SWRCB,N/A,,"1001 I Street, 16th Floor",,Sacramento,CA,95814,9163279401,38°0'46"N 122°17'47"W,"Hercules, Pinole",Contra Costa,,Tennent Avenue and Railroad Avenue,94564,4.5,401-010-010,SR 4 & I-80,"San Pablo Bay; Pinole, Ohlone, Refugio, & Rodeo Creek",No,,,,,,,,,,,,State Water Board ,No,6/13/2016,No,Yes,No,,Yes,,Yes,,"1001 I Street, 16th Floor, Sacramento, CA 95814"