SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2009091004,San Luis and Delta Mendota Water Authority,,,B.F. Sisk Dam Raise and Reservoir Expansion Project,NOP,5/14/2020,,"As a connected action to the B.F. Sisk SOD Modification Project, SLDMWA in collaboration with Reclamation seeks to evaluate increasing storage capacity in San Luis Reservoir for the purpose of providing greater water supply reliability for south-of-Delta contractors dependent on San Luis Reservoir. The increased storage capacity would be achieved by an additional 10-foot raise of the B.F. Sisk Dam embankment across the entire dam crest above the level proposed for dam safety purposes. Increased capacity within San Luis Reservoir would, consistent with the project objectives, be used to store water supply divertible under the existing operation requirements for the CVP and SWP in periods when the existing reservoir would otherwise be full. This stored supply would be used to help meet existing demands under the existing contract supplies and would not serve any new demands or establish any new places of use of CVP or SWP project water. The B.F. Sisk Dam Raise and Reservoir Expansion Project would also implement modifications to State Route 152 in areas where the increased water surface elevation in the reservoir would interact with the roadway.",https://ceqanet.opr.ca.gov/2009091004/5,B.F. Sisk Dam Safety of Dams Modification Project,Pablo Arroyave,San Luis & Delta-Mendota Water Authority,N/A,pablo.arroyave@sldmwa.org,842 6th St,,Los Banos,CA,93635,2098269696,,,Merced,,,,,,,,,Yes,5/14/2020,6/12/2020,,,"Aesthetics, Air Quality, Geology/Soils, Greenhouse Gas Emissions, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Recreation, Transportation, Tribal Cultural Resources",,,,,,,,,,,,,,,,,