SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2009088251,Fish & Game #4,,,Agreement 2009-0065-R4 - PG&E Falls Beach Picnic Area Erosion Control,NOE,8/26/2009,8/26/2009,"The Project consists of replacing an existing cobble riprap at a minimum thickness of 24 inches along approximately 530 feet of shoreline and 15 feet in width. Work will occur in dry conditions when the lake level has been reduced for the winter season. Hay bales, straw wattles and a silt fence will be installed between the construction area and the wet area of the reservoir during construction.",https://ceqanet.opr.ca.gov/2009088251,Agreement 2009-0065-R4 - PG&E Falls Beach Picnic Area Erosion Control,Julie Means,California Department of Fish and Game,N/A,,San Joaquin Valley / Southern Sierra Region,1234 E. Shaw Avenue,Fresno,CA,93710,(559) 243-4015 x240,,Madera,Madera,,,,,,,,,,,,,,,,,Categorical Exemption,"15302, Class 2 c",Subject Project involves replacement of an existing bank stabilization structure.,,,,,,,,,,,,