SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2009061047,Caltrans 6 (Fresno),"California Department of Transportation, District 6",,State Route 99 Island Park 6-Lane Project - Agreement 2011-0187-R4,NOD,3/30/2012,3/30/2012,"The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement, pursuant to Section 1602 of the Fish and Game Code, to the Project applicant. Caltrans proposes to construct a new 141 foot wide (four-12-foot lanes in each direction, 23-foot median and 10-foot outside shoulders) by 877 foot long, 6-span Cast-in-Place Post-Tensioned Concrete Box Girder Bridge to replace the existing 90 foot wide by 877 foot long San Joaquin River (SJR) Bridge (Br No 41-0090) which will be removed. The bridge will be widened to the west. The elevation of the beginning of the bridge and the end of the bridge will be the same as existing but there will be a crest at the midpoint of the bridge. This will allow the storm water to drain to the bridge ends and be treated by the bio-swales. The roadway will initially be widened to three lanes in each direction, which will leave two lanes (one each direction) free for future widening to an 8-Lane freeway without further bridge work.",https://ceqanet.opr.ca.gov/2009061047/5,Island Park Six-Lane Project,Laura Peterson-Diaz,California Department of Fish and Game,N/A,,Central Region,1234 East Shaw Avenue,Fresno,CA,93710,559 243 4017 ext. 225,,"Fresno, Madera","Fresno, Madera",,SR 99,,,,99,San Joaquin River,,,,,,,,,,,,,California Department of Fish and Game ,No,3/28/2012,No,No,Yes,,Yes,,No,Yes,"Caltrans - District 6 Environmental Planning, 855 M Street, Suite 200, Fresno, California 93721."