SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2009031083,Los Angeles County,,,Removal Action Workplan for Metropolitan Transportation Authority (MTA)/Butterfield Site,NOP,3/24/2009,,"The proposed project addresses the mobility needs within the Westside Subway Extension Transit Corridor by providing faster and more reliable high-capacity public transportation than existing bus services, which operate in mixed-flow traffic. This improvement will bring about a significant increase in east-west capacity within the Corridor by extending the benefits of the existing Metro Red/Metro Purple Line rail services beyond their current termini at Wilshire/Western Station and a combined alternative that would also extended the Metro Red Line at the Hollywood/Highland Station in Los Angeles to the Westside of Los Angeles and Santa Monica. Project length for the Wilshire Boulevard Alignment Heavy Rail (Alternative 1) is 12.5 miles extending from the Metro Purple Line Wilshire/Western Station to 4th Street and Wilshire Boulevard in Santa Monica and would include 10 stations and 1 optional station. Wilshire/Santa Monica Boulevards Combined HRT Subway (Alternative 11) includes the full Wilshire Boulevard HRT Subway and adds a second line extending west from the Metro Red Line Hollywood/Highland Station via Santa Monica Boulevard to join the Wilshire Line in Beverly Hills. The total combined line is 17 miles long and includes 14 stations and 1 optional station. In addition, any other alternatives identified during scoping meetings that have not previously been evaluated will be addressed in the EIR.",https://ceqanet.opr.ca.gov/2009031083,Westside Subway Extension Project,David Mieger,Los Angeles County Metropolitan Transportation Authority -LACMTA,N/A,,One Gateway Plaza,,Los Angeles,CA,90012,2139223040,34°4'3.84"N 118°23'55.6"W,"Beverly Hills, Los Angeles, Santa Monica, West Hollywood",Los Angeles,,Wilshire/Western to Wilshire/4th Street and Hollywood/Highland to Wilshire/La Clenega,90095,24320,Multiple,"I-405, I-10",Los Angeles River,,Yes,3/24/2009,5/7/2009,Transportation,,"Aesthetics, Air Quality, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Economics/Jobs, Fiscal Impacts, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildlife",,,,,,,,,,,,,,,,,