SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2009018160,"Water Resources, Department of",California Department of Water Resources,DWR,Oroville Sta 14 Improvement Works,NOE,1/22/2009,1/22/2009,"Improvements to existing booster station 14 include: 75 feet x 50 feet construction work area: 5,000 gpm intake pump; mechanical and electrical installation and upgrades; back-up diesel generator; double-walled, NFPA37-compliant sub-base fuel tank for generator; fencing to secure site. A 12.5 foot high retaining wall will be cut into the existing terrain adjacent to station 14, encompassing the 52 ft. x 16 ft project footprint required for the new installations.",https://ceqanet.opr.ca.gov/2009018160,Oroville Sta 14 Improvement Works,Gwen Knittweis,California Department of Water Resources,N/A,,"1725 23rd Street, 220",,Sacramento,CA,95816,9166539593,,Oroville,Butte,,,,,,,,,,,,,,,,,Categorical Exemption,15302 - Class 2,Project replaces the intake pump and installs an emergency back-up generator to ensure a reliable source of water.,,,,,,,,,,,,