SCH Number,Lead Agency Name,Lead Agency Title,Lead Agency Acronym,Document Title,Document Type,Received,Posted,Document Description,Document Portal URL,Project Title,Contact Full Name,Contact Authority,Contact Job Title,Contact Email Address,Contact Address 1,Contact Address 2,Contact City,Contact State,Contact Zip Code,Contact Phone Number,Location Coordinates,Cities,Counties,County Clerks,Location Cross Streets,Location Zip Code,Location Total Acres,Location Parcel Number,Location State Highways,Location Waterways,Location Airports,NOC Has Non Late Comment,NOC State Review Start Date,NOC State Review End Date,NOC Development Type,NOC Local Action,NOC Project Issues,NOC Local Review Start Date,NOC Local Review End Date,NOE Exempt Status,NOE Exempt Citation,NOE Reasons for Exemption,NOD Agency,NOD Approved By Lead Agency,NOD Approved Date,NOD Significant Environmental Impact,NOD Environmental Impact Report Prepared,NOD Negative Declaration Prepared,NOD Other Document Type,NOD Mitigation Measures,NOD Mitigation Reporting Or Monitoring Plan,NOD Statement Of Overriding Considerations Adopted,NOD Findings Made Pursuant,NOD Final EIR Available Location 2008111059,San Diego County Water Authority,,,Pipelines 3 and 4 Relining Project--Miramar Hill to State Route 52,MND,11/17/2008,,"The porposed project consists of the rehabilitation of approximately 44,000 linear feet of existing Prestressed Concrete Cylinder Pipe (PCCP) along the existing San Diego County Water Authority (Water Authority) Pipline 3 (32,000 ft) and Pipeline 4 (12,000 ft). The proposed project would rehabilitate Pipelines 3 and 4 through instllation of a steel liner into the existing PCCP along two continuous segments of the pipelines within the City of San Diego. Thirty temporary pipline access portals would be constructed as part of the proposed project, as would three valve vaults. Installation of three inline valves, an inline bulkhead, a drain valve and replacement drain, cathodic station testing wires, and a reconnection of Pipeline 4 to Pipeline 3 on the south of SR 52 also would be included in the proposed project.",https://ceqanet.opr.ca.gov/2008111059,Pipelines 3 and 4 Relining Project--Miramar Hill to State Route 52,Mark V. Tegio,San Diego County Water Authority,N/A,,4677 Overland Avenue,,San Diego,CA,92123,8585226753,32°53'15"N 117°6'21"W,San Diego,San Diego,,Hawkeye Way/Spitfire Road to Portobello Drive/Camino Playa Baja,92129-24,"44,000",3185211400 to 3730718400,"I-15, SR 52, SR 163",San Diego River,MCAS Miramar,No,11/17/2008,12/16/2008,Water Facilities,,"Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services, Schools/Universities, Transportation, Vegetation, Wetland/Riparian, Wildlife",,,,,,,,,,,,,,,,,